3-2-8-razborka-i-sborka-pyatojj-peredachi.html
3.2.8. Dismantling and assembly of the fifth transferDismantling
Turn off 9 bolts and uncover the party of the transmission.
ATTENTION
You watch to deforming a side cover at removal.
|
Using the special tool, take out a lock ring 1.
Turn off a bolt of a shaft of a fork of gear shifting 2.
|
Fig. 3.52. Lock ring, shaft of a fork of gear shifting and fork of gear shifting
|
Take out a fork of gear shifting 3 and a gear wheel of the fifth transfer. Use a stripper if the nave densely sits on vents (fig. 3.52).
|
Fig. 3.53. Nut of an intermediate shaft and gear wheel of the fifth transfer of the leading shaft
|
To Raskontrita a nut of an intermediate shaft 2, establish a gear wheel of the fifth transfer of the leading shaft 1 and the device for fixing of shaft, then turn off a nut of an intermediate shaft 2 (fig. 3.53).
|
Fig. 3.54. Removal of a gear wheel of the fifth transfer of the leading shaft
|
Remove a gear wheel of the fifth transfer from the leading shaft, the needle bearing and a gear wheel of the fifth transfer from an intermediate shaft 1. The stripper for gear wheels 2 is required if the nave of a gear wheel of the fifth transfer densely sits on vents of an intermediate shaft (fig. 3.54).
Assembly
|
Fig. 3.55. Inflows of a gear wheel of the fifth transfer of the leading shaft: A – the processed inflow (inside); B – inflow without processing (outside)
|
Establish a gear wheel of the fifth transfer 1 on an intermediate shaft, the processed inflow of "A" has to be turned inside (fig. 3.55).
Apply gearbox oil on the needle bearing and establish it on the leading shaft.
Establish a gear wheel of the fifth transfer 1 on the leading shaft.
Install the special tool for fixing of a shaft.
Tighten a new nut of an intermediate shaft 2 the nominal force of an inhaling and you zakontrit a nut.
Moment of an inhaling of a nut of an intermediate shaft (a): 100 N · m.
Collect the synchronizer of the fifth transfer: plug 1, nave 2, levers of the synchronizer 3 and ring of the synchronizer 4 as follows (fig. 3.56).
|
Fig. 3.57. Installation of the lever of the synchronizer: A – the party with a facet; B – long inflow
|
Install synchronizer 1 levers on a nave 2 in the specified situation, as shown in the figure 3.57.
|
Fig. 3.58. Combination of levers with a flute on a nave
|
NOTE
Combine a ledge of "A" of levers of the fifth transfer 1 with a flute on a nave of 2 (fig. 3.58).
|
|
Fig. 3.59. Installation of a ring of the synchronizer
|
Establish a synchronizer 1 ring on a nave 2 in the specified direction, as shown in the figure 3.59.
|
Fig. 3.60. Installation of a fork of switching of the fifth transfer to the plug and nave
|
Install a fork of switching of the fifth transfer 1 on the plug 3 and a nave 2, and establish them on the leading shaft and a shaft of gear shifting, having combined a tag 4 with the corresponding tag 5 on the leading shaft (fig. 3.60).
Tighten a bolt of a shaft of a fork of gear shifting 2 on which carving part sealant for carvings was applied.
Moment of an inhaling of a bolt of a shaft of a fork of gear shifting (a): 10 N · m.
|
Fig. 3.61. Installation of a new lock ring on the leading shaft
|
Using the special tool, establish a new lock ring 1 on the leading shaft 3 in the specified direction, as shown in the drawing (fig. 3.61).
|
Fig. 3.62. The scheme of putting sealant on the surface of the left case and a side cover
|
Clear the interfaced surfaces of the left case 2 and a side cover 1, apply sealant on a side cover, as shown in the drawing, the diamer of section of the roller of sealant has to make 1,5 mm, establish a cover with the left case, and then tighten bolts of a side cover the nominal force of an inhaling (fig. 3.62).
Moment of an inhaling of a bolt of a side cover (a): 10 N · m.
|